Hurray! Look at the front of our house!!
It looks finished - the scaffolding's gone, the plywood's gone from the windows, it's painted, new windows installed, the gargage floor is poured and, hey, a new low-profile carriage-style garage door is attached.
Inside, we're still down to studs. Paul's passed the electrical rough inspection and still working on the plumbing. We need to install the water heater, HVAC, floors and handrails on the stairs, pass the plumbing inspection, and hang and tape the 150+ sheets of sheetrock before we move in, but it should start moving faster, especially since we're hiring a sheetrocker and a floor guy.
After we move in, there will still be a lot of work to do: finishing the 2 new bathrooms, building the stairs outside between the decks and putting the balcony railings, painting the interior. Plus other things that I'm sure aren't even on my radar yet but will surely rear their heads.